Name of the project:

The bridge over the river Savo in Krškom

Title: Construction of the Žadovinek bridge

Investor: Kolektor Koling doo

Start of works : 07/2017

Completion of works : 08/2018

Type of work :

-Works on the construction of abutments
-Works on the construction of the span structure of the bridge (pushing/pushing technology)
-Works on the construction of the upper structure of the bridge

Skip to content