Name of the project:
The bridge over the river Savo in Krškom
Title: Construction of the Žadovinek bridge
Investor: Kolektor Koling doo
Start of works : 07/2017
Completion of works : 08/2018
Type of work :
-Works on the construction of abutments
-Works on the construction of the span structure of the bridge (pushing/pushing technology)
-Works on the construction of the upper structure of the bridge